Fort Peck Dam (MT)
6/24 Pool Elev: 2251.4 ft-msl
24-hr change: -0.2'
6/24 Ave Inflow: 45,000 cfs
6/24 Ave Release: 59,600 cfs
6/25 Scheduled Release: 60,000 cfs
Garrison Dam (ND)
6/24 Pool Elev: 1854.5 ft-msl
24-hr change: 0.1'
6/24 Ave Inflow: 153,000 cfs
6/24 Ave Release: 150,500 cfs
6/25 Scheduled Release: 150,000 cfs
Oahe Dam (SD)
6/24 Pool Elev: 1619.3 ft-msl
24-hr change: -0.1'
6/24 Ave Inflow: 160,000 cfs
6/24 Ave Release: 150,300 cfs
6/25 Scheduled Release: 150,000 cfs