Can I choose the location?
Unfortunately not, due to the operation of the equipment.

Show All Answers

1. Where on my home will the new endpoint be installed?
2. Can I choose the location?
3. Can I paint the endpoint?
4. My neighbor got a new meter, why am I only getting the box? I want a new meter.
5. Will service be interrupted?
6. Do I have to pay for this?
7. What is the frequency of the signal?
8. What is the duration of transmission?
9. What is the frequency (time) of transmission?
10. How will the City get the water meter readings?
11. Do I have to be home for the installation?
12. Why must there be 36 inches of clear space around the meter?